Eskom declares Stage four load-shedding: Take a look at the record of affected areas



Metropolis Energy is at the moment implementing stage 4 load-shedding between 12pm to 10pm, after Eskom introduced that the ability system continues to be constrained. 

Please examine under in case your space might be affected:

For these residents provided by Eskom, examine the load-shedding schedule here

For these residents provided by Metropolis Energy, see the affected areas under:

Associated articles:

Load shedding returns with a vengeance

Lights out: Eskom implements Stage 2 load shedding across Joburg

 





Source link

Leave a Reply

Your email address will not be published. Required fields are marked *